Clorox Boiler Room
Project Details:
Install new turnkey cast-in-place concrete boiler room foundation
14+ tons of steel
Challenges:
Monolithic pour including sump pit and trench drains
Installation of helical piles due to poor soil conditions
Mitigate excessive groundwater through use of temporary sump pits
Demanding pour schedule due to active adjacent railroad tracks